Briefing/projectactive
Hovey Solar 2 is a 8 MW Solar project in ERCOT, currently active.
BARILLA SOLAR, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-07-18.
- Queue ID
- ERCOT-26INR0736
- Technology
- Solar
- Developer
- BARILLA SOLAR, LLC
- Market / region
- ERCOT
- Point of interconnection
- 60385 Solstice 138 kV
What stands out
1
Hovey Solar 2 is a 8 MW Solar project with status active.
2
BARILLA SOLAR, LLC is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2026-07-18.
Market and operating context
- Queue date
- 2025-11-28
- Proposed COD
- 2026-07-18
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.