Query
Hovey Solar 2
Type
Entity Briefing
Entity
Hovey Solar 2
Generated
2026-10-06T22:49:32.013Z

Briefing on Hovey Solar 2

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
8 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-07-18
Proposed COD
In Progress (unknown study)
Queue phase
Briefing/projectactive

Hovey Solar 2 is a 8 MW Solar project in ERCOT, currently active.

BARILLA SOLAR, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-07-18.

Queue ID
ERCOT-26INR0736
Technology
Solar
Developer
BARILLA SOLAR, LLC
Market / region
ERCOT
Point of interconnection
60385 Solstice 138 kV

What stands out

1

Hovey Solar 2 is a 8 MW Solar project with status active.

2

BARILLA SOLAR, LLC is the reported developer.

3

The reported queue phase is In Progress (unknown study); proposed COD is 2026-07-18.

Market and operating context

Queue date
2025-11-28
Proposed COD
2026-07-18
IA status
In Progress (unknown study)
Study phase
In Progress (unknown study)

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Hovey Solar 2 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0736
TechnologySolar
DeveloperBARILLA SOLAR, LLC
Market / regionERCOT
Point of interconnection60385 Solstice 138 kV
Queue date2025-11-28
Proposed COD2026-07-18
IA statusIn Progress (unknown study)