180 MW
Proposed capacity
active
Current status
Solar
Technology
NYISO
Market / region
2028-05-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Horseshoe Solar is a 180 MW Solar project in New York, currently active.

Horseshoe Solar Energy LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-01.

Queue ID
NYISO-710
Location
Livingston, New York
Technology
Solar
Developer
Horseshoe Solar Energy LLC
Market / region
NYISO
Point of interconnection
Golah 115kV

What stands out

1

Horseshoe Solar is a 180 MW Solar project in New York with status active.

2

Horseshoe Solar Energy LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-01.

4

Latest linked story: “Rush residents relying on water shipments after solar project drilling incident” (13WHAM-TV, 2026-03-26).

Market and operating context

Queue date
2018-05-29
Proposed COD
2028-05-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Horseshoe Solar — verified asset snapshot

FieldValue
Queue IDNYISO-710
LocationLivingston, New York
TechnologySolar
DeveloperHorseshoe Solar Energy LLC
Market / regionNYISO
Point of interconnectionGolah 115kV
Queue date2018-05-29