Horseshoe Solar is a 180 MW Solar project in New York, currently active.
Horseshoe Solar Energy LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-01.
- Queue ID
- NYISO-710
- Location
- Livingston, New York
- Technology
- Solar
- Developer
- Horseshoe Solar Energy LLC
- Market / region
- NYISO
- Point of interconnection
- Golah 115kV
What stands out
Horseshoe Solar is a 180 MW Solar project in New York with status active.
Horseshoe Solar Energy LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-05-01.
Latest linked story: “Rush residents relying on water shipments after solar project drilling incident” (13WHAM-TV, 2026-03-26).
Market and operating context
- Queue date
- 2018-05-29
- Proposed COD
- 2028-05-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.