Horseshoe Solar (NYISO-710) — Project Summary

Queue ID
NYISO-710
Capacity
180 MW
Technology
Solar
Status
active
Location
Livingston, NY
Region
NYISO
Developer
Horseshoe Solar Energy LLC
IA Status
Facility Study

Horseshoe Solar

NYISO-710BetaActiveSolarNYISOLBNL + Live

180 MW generation in Livingston, NY · In queue since May 2018 · Proposed COD May 2028

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

180 MW

Capacity

1

Components

Solar

8y 6m

In Queue

Facility Study

IA Phase

Signed Jan 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 8m

IA → COD

5y 4m

Total Duration

4y 8m

Construction50%
Queue EntryMay 29, 2018

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementJan 11, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Interconnection Queue; status 11

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-05-01

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneaquifer incident during HDD drillingWHEC.com · 2026-02-28
Delay reasonaquifer struck during drilling causing water surfacingWHEC.com · 2026-02-28

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2024
Differs from queue: May 1, 2028
Developer in saved assessment
Horseshoe Solar Energy LLC
From queue filing
Status at research time
Construction
Construction — active construction with aquifer incident during HDD drilling reported February 2026
Financing
Not recorded

Milestones in this assessment

Permit approvedJan 5, 2023

Final siting permit approved by New York State

thelcn.com
Groundbreaking2024

Construction expected to begin in 2024 per permit approval announcement

thelcn.com
constructionFeb 2026Latest in this assessment

Aquifer incident during HDD drilling operations, construction actively underway

whec.com
Research sources and reasoning (2 recorded sources)

high confidence at research time

  1. thelcn.com/news/local/horseshoe-solar-receives-final-siting-permit-construction-expected-in-2024/article_5a54ef06-8bfe-5dd4-be35-1858d9d6d86f.html
  2. whec.com/top-news/horseshoe-solar-addresses-aquifer-incident-during-livingston-county-construction/

Commercial operation date: LBNL lists 2028-05-01 COD, but Livingston County News (2023-01-05) reported 'construction expected in 2024' after final siting permit approval. WHEC.com (2026-02-28) confirms construction is underway with aquifer incident during HDD drilling, indicating project is 4 years ahead of LBNL's stale queue date.

Developer: Both LBNL and news sources consistently identify 'Horseshoe Solar Energy LLC' as the developer. No parent company or operating entity identified in available sources, suggesting this may be a project-specific LLC but no parent company is publicly disclosed.

Status: LBNL shows 'active' in Facility Study phase, but WHEC.com (2026-02-28) reports active construction with drilling incident, confirming project has advanced well beyond study phase into physical construction.

Project lifecycle
as of 2026-02-28
PhaseConstructionLivingston County News · 2023-01-05
OperationalNoWHEC.com · 2026-02-28
TechnologySolarWHEC.com · 2026-02-28
DeveloperInvenergy±WHEC.com · 2026-02-28
GroundbreakingAnnouncedWHEC.com · 2026-02-28
DelayAnnouncedWHEC.com · 2026-02-28
Permit decisionconditionalWHEC.com · 2026-02-28

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Horseshoe Solar is a proposed 180 MW solar generation project located in Livingston County, New York. The project, developed by Horseshoe Solar Energy LLC, is currently active in the NYISO interconnection queue as queue ID NYISO-710, with an entry date of May 29, 2018. The proposed commercial operation date is December 1, 2025, and the project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Golah 115kV substation.

The proposed project is linked to the existing Horseshoe Solar Energy operating plant (EIA ID 63096). Horseshoe Solar has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Livingston

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Horseshoe Solar Energy LLC

Utility

NM-NG

Entity

NYISO

Service Type

—

Point of Interconnection

Golah 115kV

Data Source

LBNL + Live

ApplicantHorseshoe SolarLivingston County News · 2023-01-05
AgencyNew York StateLivingston County News · 2023-01-05
RulingApprovalLivingston County News · 2023-01-05
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
GENESE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (6)Beta

Last updated 2026-03-26

View all 6 articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.