Briefing/projectactive
HILLBORO BESS is a 127 MW Wind+Battery project in Texas, currently active.
Abei Energy Green XI LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-21.
- Queue ID
- ERCOT-26INR0402
- Location
- Hill, Texas
- Technology
- Wind+Battery
- Developer
- Abei Energy Green XI LLC
- Market / region
- ERCOT
- Point of interconnection
- TAP 138 kV 3522 HILLBORO1_8 - 234 CHATT
What stands out
1
HILLBORO BESS is a 127 MW Wind+Battery project in Texas with status active.
2
Abei Energy Green XI LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-21.
Market and operating context
- Queue date
- 2024-02-27
- Proposed COD
- 2028-09-21
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.