Briefing on HILLBORO BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
127 MW
Proposed capacity
active
Current status
Wind+Battery
Technology
ERCOT
Market / region
2028-09-21
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

HILLBORO BESS is a 127 MW Wind+Battery project in Texas, currently active.

Abei Energy Green XI LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-21.

Queue ID
ERCOT-26INR0402
Location
Hill, Texas
Technology
Wind+Battery
Developer
Abei Energy Green XI LLC
Market / region
ERCOT
Point of interconnection
TAP 138 kV 3522 HILLBORO1_8 - 234 CHATT

What stands out

1

HILLBORO BESS is a 127 MW Wind+Battery project in Texas with status active.

2

Abei Energy Green XI LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-21.

Market and operating context

Queue date
2024-02-27
Proposed COD
2028-09-21
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

HILLBORO BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0402
LocationHill, Texas
TechnologyWind+Battery
DeveloperAbei Energy Green XI LLC
Market / regionERCOT
Point of interconnectionTAP 138 kV 3522 HILLBORO1_8 - 234 CHATT
Queue date2024-02-27
Proposed COD2028-09-21