Briefing/projectactive
Hill Valley BESS is a 246 MW Battery project in Texas, currently active.
Hill Valley BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-15.
- Queue ID
- ERCOT-26INR0285
- Location
- Grimes, Texas
- Technology
- Battery
- Developer
- Hill Valley BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- 345 kV Singleton (#44645)
What stands out
1
Hill Valley BESS is a 246 MW Battery project in Texas with status active.
2
Hill Valley BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-07-15.
Market and operating context
- Queue date
- 2023-12-04
- Proposed COD
- 2028-07-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.