Query
Hill Valley BESS
Type
Entity Briefing
Entity
Hill Valley BESS
State
IL
Technology
battery
Generated
2026-09-18T14:11:27.004Z

Briefing on Hill Valley BESS

Entity Briefing
Generated Sep 18, 2026·Dataset freshness not reported
246 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-07-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Hill Valley BESS is a 246 MW Battery project in Texas, currently active.

Hill Valley BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-15.

Queue ID
ERCOT-26INR0285
Location
Grimes, Texas
Technology
Battery
Developer
Hill Valley BESS, LLC
Market / region
ERCOT
Point of interconnection
345 kV Singleton (#44645)

What stands out

1

Hill Valley BESS is a 246 MW Battery project in Texas with status active.

2

Hill Valley BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-15.

Market and operating context

Queue date
2023-12-04
Proposed COD
2028-07-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Hill Valley BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0285
LocationGrimes, Texas
TechnologyBattery
DeveloperHill Valley BESS, LLC
Market / regionERCOT
Point of interconnection345 kV Singleton (#44645)
Queue date2023-12-04
Proposed COD2028-07-15