Briefing/projectactive
Hide Town Energy Storage is a 101 MW Battery project in Texas, currently active.
Hide Town Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-10-11.
- Queue ID
- ERCOT-25INR0287
- Location
- Scurry, Texas
- Technology
- Battery
- Developer
- Hide Town Energy Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- 1311 SACROC 138kV
What stands out
1
Hide Town Energy Storage is a 101 MW Battery project in Texas with status active.
2
Hide Town Energy Storage LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-10-11.
Market and operating context
- Queue date
- 2023-01-17
- Proposed COD
- 2029-10-11
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.