Query
Hidden Lakes BESS
Type
Entity Briefing
Entity
Hidden Lakes BESS
State
TN
Technology
battery
Generated
2026-10-19T19:43:01.881Z

Briefing on Hidden Lakes BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-05-24
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Hidden Lakes BESS is a 10 MW Battery project in Texas, currently active.

SBESS TX 6 LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-05-24.

Queue ID
ERCOT-23INR0617
Location
Galveston, Texas
Technology
Battery
Developer
SBESS TX 6 LLC
Market / region
ERCOT
Point of interconnection
Station Name: HDNLAKES PTI Bus#: 38900 Load XFMR Name: HDLAKE_2 Transmission Level Voltage: 138 kV

What stands out

1

Hidden Lakes BESS is a 10 MW Battery project in Texas with status active.

2

SBESS TX 6 LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-05-24.

Market and operating context

Queue date
2023-06-14
Proposed COD
2026-05-24
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Hidden Lakes BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0617
LocationGalveston, Texas
TechnologyBattery
DeveloperSBESS TX 6 LLC
Market / regionERCOT
Point of interconnectionStation Name: HDNLAKES PTI Bus#: 38900 Load XFMR Name: HDLAKE_2 Transmission Level Voltage: 138 kV
Queue date2023-06-14
Proposed COD2026-05-24