Query
Hawkeye Wind Farm
Type
Entity Briefing
Entity
Hawkeye Wind Farm
Generated
2026-10-19T02:16:46.546Z

Briefing on Hawkeye Wind Farm

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
35 MW
Capacity
Operating
Current status
2012
Operating since
1
Generators
56.5%
Capacity factor
173 GWh
Annual generation
Briefing/plantOperating

Hawkeye Wind Farm is a 35 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.

Hawkeye Wind Farm is reported in Iowa since 2012 under Greenbacker Renewable Energy Corporation. Available operating and financial measures include 56.5% capacity factor and 173 GWh annual generation; $1895/kW reported CapEx.

Location
Bremer, Iowa
Technology
Onshore Wind Turbine
Owner / parent
Greenbacker Renewable Energy Corporation
Operator
Greenbacker Renewable Energy Corporation
Grid
MISO (Midcontinent)
Plant ID
57832

What stands out

1

Hawkeye Wind Farm is a 35 MW Onshore Wind Turbine asset in Iowa with status Operating.

2

Latest annual operating measures report 56.5% capacity factor and 173 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#78 of 123
National rank
#1014 of 1,442

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.