Briefing/projectactive
HarryoungBESS is a 190 MW Solar+Battery project in Texas, currently active.
Gransolar Group (GRS) is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-15.
- Queue ID
- ERCOT-25INR0552
- Location
- Cameron, Texas
- Technology
- Solar+Battery
- Developer
- Gransolar Group (GRS)
- Market / region
- ERCOT
- Point of interconnection
- 8319 Rio Hondo sub 138kV
What stands out
1
HarryoungBESS is a 190 MW Solar+Battery project in Texas with status active.
2
Gransolar Group (GRS) is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-05-15.
Market and operating context
- Queue date
- 2023-10-04
- Proposed COD
- 2028-05-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.