Briefing on Harley Hand Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
503 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-04-07
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Harley Hand Storage is a 503 MW Solar+Battery project in Texas, currently active.

Hecate Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-07.

Queue ID
ERCOT-23INR0214
Location
Nolan, Texas
Technology
Solar+Battery
Developer
Hecate Energy
Market / region
ERCOT
Point of interconnection
11420 Sweetwater East 345kV

What stands out

1

Harley Hand Storage is a 503 MW Solar+Battery project in Texas with status active.

2

Hecate Energy is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-07.

Market and operating context

Queue date
2021-03-01
Proposed COD
2029-04-07
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Harley Hand Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0214
LocationNolan, Texas
TechnologySolar+Battery
DeveloperHecate Energy
Market / regionERCOT
Point of interconnection11420 Sweetwater East 345kV
Queue date2021-03-01