Harley Hand Storage (ERCOT-23INR0214) — Project Summary

Queue ID
ERCOT-23INR0214
Capacity
503.4 MW
Technology
Solar+Battery
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
Hecate Energy Harley Hand Solar LLC
IA Status
Facility Study

Harley Hand Storage

ERCOT-23INR0214BetaActiveBatteryBatteryERCOTLBNL + Live

503.4 MW generation in Nolan, TX · In queue since March 2021 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

503.4 MW

Capacity

1

Components

Battery

5y 8m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 1m

Facilities Study50%
Queue EntryMar 1, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-07

Queue history
23INR0214 · 54 monthly ERCOT reports, Apr 2022 – Sep 2026

Projected COD moved

5 times

Dec 2024 → Apr 2029

Net change

+52 months

first report to latest

Capacity

514 → 503 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 1, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 7, 2029
From queue filing
Developer in saved assessment
Hecate Energy
Filed as Hecate Energy Harley Hand Solar LLC
Status at research time
Active
Active in the ERCOT queue. The September 2026 GIS shows the system impact study complete and the full interconnection study started, with no interconnection agreement yet. The county tax abatement for the solar+storage project was being amended in Dec 2025.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. ercotqueue.com/project/23INR0214
  2. co.nolan.tx.us/upload/page/10401/CCM%2012082025.pdf
  3. interconnection.fyi/project/ercot-23inr0214
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0214/harley-hand-storage
  5. ercotqueue.com/developer/hecate-energy-harley-hand-storage-llc

Commercial operation date: Every 2029 date found (cleanview 'Expected online 2029', interconnection.fyi 'April 7, 2029', ercotqueue.com 'Projected COD Q2 2029') comes from the queue data itself. No developer press release or financing-backed target exists. ercotqueue.com shows the project at 'SS Completed, FIS Started, No IA', so the date is unconfirmed.

Developer: The LBNL filing entity is a project LLC. Nolan County's Dec 2025 meeting notice refers to 'Hecate Harley Hand Solar, LLC and Hecate Harley Hand Storage, LLC (collectively the "Hecate")' on the Harley Hand Solar and Storage tax abatement, so Hecate Energy is the operating developer. Aggregators list the storage LLC variant 'Hecate Energy Harley Hand Storage LLC'. No ownership change was found.

Status: LBNL lists the project as active at Facility Study, and ercotqueue.com's GIS-based row ('SS Completed, FIS Started, No IA') is consistent with that. interxdata's 'operational' label conflicts with this and with the 'No IA' status, so I treated it as an unreliable aggregator error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Harley Hand Storage project is a proposed 509 MW battery storage project in Nolan County, Texas. It is being developed by Hecate Energy Harley Hand Solar LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0214, with a queue entry date of March 1, 2021.

The proposed commercial operation date for the Harley Hand Storage project is April 7, 2029. Its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the 11420 Sweetwater East 345kV substation.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Harley Hand Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

11420 Sweetwater East 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
TRENT_TRENT
POI Substation
Sweetwater East Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.