Gridline Solar is a 400 MW Solar project in Texas, currently active.
Big Lake Ranch LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-01.
- Queue ID
- ERCOT-29INR0184
- Location
- Crockett, Texas
- Technology
- Solar
- Developer
- Big Lake Ranch LLC
- Market / region
- ERCOT
- Point of interconnection
- 76005 Schneeman Draw LCRA
What stands out
1
Gridline Solar is a 400 MW Solar project in Texas with status active.
2
Big Lake Ranch LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-07-01.
4
Latest linked story: “Avangrid Installs First Solar Panels at Powell Creek Project in Ohio” (Business Wire, 2024-07-10).
Market and operating context
- Queue date
- 2025-08-18
- Proposed COD
- 2029-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.