Greene County 2 is a 10 MW Solar project in New York, currently active.
Hecate Energy Greene 2 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-01.
- Queue ID
- NYISO-573
- Location
- Greene, New York
- Technology
- Solar
- Developer
- Hecate Energy Greene 2 LLC
- Market / region
- NYISO
- Point of interconnection
- Coxsackie 13.8kV
What stands out
1
Greene County 2 is a 10 MW Solar project in New York with status active.
2
Hecate Energy Greene 2 LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-06-01.
Market and operating context
- Queue date
- 2016-09-06
- Proposed COD
- 2027-06-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.