Query
GREASEWOOD ENERGY STORAGE
Type
Entity Briefing
Entity
GREASEWOOD ENERGY STORAGE
Technology
battery
Generated
2026-10-06T21:00:23.961Z

Briefing on GREASEWOOD ENERGY STORAGE

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
513 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2031-06-01
Proposed COD
C14
Queue phase
Briefing/projectactive

GREASEWOOD ENERGY STORAGE is a 513 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2031-06-01.

Queue ID
CAISO-2089
Location
Kern, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Whirlwind Substation 500 kV

What stands out

1

GREASEWOOD ENERGY STORAGE is a 513 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2031-06-01.

Market and operating context

Queue date
2021-04-15
Proposed COD
2031-06-01
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

GREASEWOOD ENERGY STORAGE — verified asset snapshot

FieldValue
Queue IDCAISO-2089
LocationKern, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionWhirlwind Substation 500 kV
Queue date2021-04-15
Proposed COD2031-06-01
IA statusIA Executed