Query
Grassy Plains queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
Gypsum Plains Solar
ISO/RTO
isone
Generated
2026-10-11T02:19:59.120Z

Briefing on Gypsum Plains Solar

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
503 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-06-21
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Gypsum Plains Solar is a 503 MW Solar+Battery project in Texas, currently active.

Gypsum Plains Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-21.

Queue ID
ERCOT-28INR0205
Location
Ector, Texas
Technology
Solar+Battery
Developer
Gypsum Plains Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kv line Wolf BUS# 11010 - Reiter BUS#18544

What stands out

1

Gypsum Plains Solar is a 503 MW Solar+Battery project in Texas with status active.

2

Gypsum Plains Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-06-21.

Market and operating context

Queue date
2025-06-05
Proposed COD
2029-06-21
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gypsum Plains Solar — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0205
LocationEctor, Texas
TechnologySolar+Battery
DeveloperGypsum Plains Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kv line Wolf BUS# 11010 - Reiter BUS#18544
Queue date2025-06-05
Proposed COD2029-06-21