Query
Glory Bee Solar
Type
Entity Briefing
Entity
Glory Bee Solar
Generated
2026-10-19T19:00:31.653Z

Briefing on Glory Bee Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
305 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-04-14
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Glory Bee Solar is a 305 MW Solar+Battery project in Texas, currently active.

Riley Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-04-14.

Queue ID
ERCOT-24INR0368
Location
Erath, Texas
Technology
Solar+Battery
Developer
Riley Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 1440 Comanche Switch - 1900 Comanche Peak

What stands out

1

Glory Bee Solar is a 305 MW Solar+Battery project in Texas with status active.

2

Riley Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-04-14.

Market and operating context

Queue date
2022-06-10
Proposed COD
2026-04-14
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Glory Bee Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0368
LocationErath, Texas
TechnologySolar+Battery
DeveloperRiley Solar LLC
Market / regionERCOT
Point of interconnectionTap 345kV 1440 Comanche Switch - 1900 Comanche Peak
Queue date2022-06-10
Proposed COD2026-04-14