Glacier Battery Storage is a 2 MW Batteries asset in Washington, currently Operating.
Glacier Battery Storage is reported in Washington since 2016 under PUGET HOLDINGS. Available operating and financial measures include -0.1% capacity factor and -0 GWh annual generation; $1763/kW reported CapEx.
- Location
- Whatcom, Washington
- Technology
- Batteries
- Owner / parent
- PUGET HOLDINGS
- Operator
- Puget Sound Energy Inc
- Grid
- Puget Sound Energy
- Plant ID
- 60444
What stands out
Glacier Battery Storage is a 2 MW Batteries asset in Washington with status Operating.
Latest annual operating measures report -0.1% capacity factor and -0 GWh annual generation.
Available financial measures include $1763/kW CapEx.
Latest linked story: “Batteries included: Power storage planned to boost electricity grids in Kitsap, elsewhere” (Kitsap Sun, 2022-10-22).
Market and operating context
- Balancing authority
- Puget Sound Energy
- NERC region
- WECC
- State rank
- #7 of 8
- National rank
- #926 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.