Search plants, projects, owners, and states
2 MW BESS operating in Whatcom, WA
2 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2016
Operating Since
Coordinates
48.8880, -121.9462
County
Whatcom, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Puget Sound Energy Inc | Puget Sound Energy | — |
| Owner(s) | Puget Sound Energy Inc | PUGET HOLDINGS | — |
| Status | Operating | — | — |
Glacier Battery Storage is a 2 MW battery energy storage system located in Whatcom County, Washington. The plant began operating in 2016 and has one generator. It is owned by Puget Holdings and operated by Puget Sound Energy Inc. The primary fuel source is electricity (MWH), which is used to charge the lithium-ion batteries. The battery system has a total storage capacity of 4.4 MWh, providing a duration of 2.2 hours at its full 2 MW output.
The facility operates within the Puget Sound Energy balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Glacier Battery Storage is ranked as the 9th largest battery storage plant in Washington and 1138th nationally, out of 10 and 1205 plants respectively.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Puget Sound Energy (PSEI)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−1 MWh
Net Charging
-24 MWh
Annual Net Energy
-0.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2016
$1,763/kW
Est. Construction Cost
Total estimated cost: $3.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Glacier Battery StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.