Briefing/projectactive
Giddings Wind is a 240 MW Wind project in Texas, currently active.
Pioneer Natural Resources is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-09-09.
- Queue ID
- ERCOT-21INR0006
- Location
- Upton, Texas
- Technology
- Wind
- Developer
- Pioneer Natural Resources
- Market / region
- ERCOT
- Point of interconnection
- 71212 Upton 138kV
What stands out
1
Giddings Wind is a 240 MW Wind project in Texas with status active.
2
Pioneer Natural Resources is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2030-09-09.
4
Latest linked story: “Equinor Suspends Work on $3 Billion Offshore Wind Farm” (OilPrice.com, 2025-12-23).
Market and operating context
- Queue date
- 2017-09-06
- Proposed COD
- 2030-09-09
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.