Briefing/projectactive
Elm Street BESS2 is a 10 MW Battery project in Texas, currently active.
North Pecos Clean Energy Center, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-24.
- Queue ID
- ERCOT-25INR0765
- Location
- Reeves, Texas
- Technology
- Battery
- Developer
- North Pecos Clean Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Elm Street TSP Station Code: ELM_ST Load Name: ELMST_3 Bus #: PTI Bus Number: 38049 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS): 8912
What stands out
1
Elm Street BESS2 is a 10 MW Battery project in Texas with status active.
2
North Pecos Clean Energy Center, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-01-24.
Market and operating context
- Proposed COD
- 2026-01-24
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.