Elm Street BESS2
9.99 MW storage in Reeves, TX · Proposed COD January 2026
9.99 MW
Capacity
1
Components
Battery
—
In Queue
IA Executed
IA Phase
Signed Dec 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
IA → COD
1y 1m
Schedule
10 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2026-01-24
Projected COD moved
2 times
Dec 2025 → Jan 2026
Net change
+1 months
first report to latest
Capacity
10 MW
unchanged in the reports
Latest stage
Commercial operation
last listed Jan 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Elm Street BESS2 is a proposed battery energy storage development project in Reeves County, Texas, with a total capacity of 9.99 MW. The project is being developed by North Pecos Clean Energy Center, LLC and is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-25INR0765. It consists of a single battery storage component rated at 9.99 MW. The project is designated as a new Distributed Energy Storage Resource (DESR) and is planned to connect at 12.47 kV to the Elm Street transmission service provider station (station code ELM_ST). It would tie in at load ELMST_3, associated with PTI bus number 38049 at the 138 kV transmission level and node 8912.
The project currently holds an active status in the ERCOT queue. Its interconnection agreement (IA) was executed on December 27, 2024. The proposed commercial operation date is January 24, 2026.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jan 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Reeves
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
North Pecos Clean Energy Center, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Elm Street TSP Station Code: ELM_ST Load Name: ELMST_3 Bus #: PTI Bus Number: 38049 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS): 8912
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ELM_ST_RN
- POI Substation
- Pecos Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Elm Street BESS2
Data-driven briefing on Elm Street BESS2 — fleet, generation, financial, and news signals.
Elm Street BESS
Data-driven briefing on Elm Street BESS — fleet, generation, financial, and news signals.
Elm Street
Data-driven briefing on Elm Street — fleet, generation, financial, and news signals.
Energy Center
Data-driven briefing on Energy Center — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.