Garnet Energy Center is a 200 MW Solar project in New York, currently active.
Garnet Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-01.
- Queue ID
- NYISO-883
- Location
- Cayuga, New York
- Technology
- Solar
- Developer
- Garnet Energy Center, LLC
- Market / region
- NYISO
- Point of interconnection
- Pannell - Clay 345kV
What stands out
Garnet Energy Center is a 200 MW Solar project in New York with status active.
Garnet Energy Center, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-04-01.
Latest linked story: “Monster CNY solar farm would replace corn and soybeans with power for 30,000 homes” (Syracuse.com, 2020-02-29).
Market and operating context
- Queue date
- 2019-06-11
- Proposed COD
- 2028-04-01
- IA status
- Facility Study
- Study phase
- Facility Study