Query
Gaia Hybrid
Type
Entity Briefing
Entity
Gaia Hybrid
State
GA
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Gaia Hybrid

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

230 MW
Capacity
Testing
Current status
2
Generators
Briefing/plantTesting

Gaia Hybrid is a 230 MW Batteries asset in ERCOT (Texas), currently Testing.

Gaia Hybrid is reported in Texas under Sunraycer Assets I LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Navarro, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Sunraycer Assets I LLC
Operator
Sunraycer Assets I LLC
Grid
ERCOT (Texas)
Plant ID
66342

What stands out

1

Gaia Hybrid is a 230 MW Batteries asset in Texas with status Testing.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#121 of 378
National rank
#301 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Gaia Hybrid — verified asset snapshot

FieldValue
LocationNavarro, Texas
TechnologyBatteries, Solar Photovoltaic
Owner / parentSunraycer Assets I LLC
OperatorSunraycer Assets I LLC
GridERCOT (Texas)
Plant ID66342
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.