Briefing/projectactive
Furay Battery Energy Storage System is a 304 MW Battery project in Texas, currently active.
Blue Topaz 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.
- Queue ID
- ERCOT-24INR0413
- Location
- Harris, Texas
- Technology
- Battery
- Developer
- Blue Topaz 1, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 45660 Jonte substation – 46332 Scenic Woods Tapping both radial lines.
What stands out
1
Furay Battery Energy Storage System is a 304 MW Battery project in Texas with status active.
2
Blue Topaz 1, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-30.
Market and operating context
- Queue date
- 2022-09-02
- Proposed COD
- 2028-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.