Furay Battery Energy Storage System Solar in ISO New England queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
Furay Battery Energy Storage System
ISO/RTO
isone
Technology
solar
Generated
2026-10-09T17:13:50.930Z

Briefing on Furay Battery Energy Storage System

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
304 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Furay Battery Energy Storage System is a 304 MW Battery project in Texas, currently active.

Blue Topaz 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.

Queue ID
ERCOT-24INR0413
Location
Harris, Texas
Technology
Battery
Developer
Blue Topaz 1, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 45660 Jonte substation – 46332 Scenic Woods Tapping both radial lines.

What stands out

1

Furay Battery Energy Storage System is a 304 MW Battery project in Texas with status active.

2

Blue Topaz 1, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-30.

Market and operating context

Queue date
2022-09-02
Proposed COD
2028-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Furay Battery Energy Storage System — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0413
LocationHarris, Texas
TechnologyBattery
DeveloperBlue Topaz 1, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 45660 Jonte substation – 46332 Scenic Woods Tapping both radial lines.
Queue date2022-09-02
Proposed COD2028-09-30