Franklin Farms is a 1.6 GW Gas project in Louisiana, currently active.
Entergy Louisiana, LLC is the reported developer. The reported queue phase is ERAS Study Cycle 1. Proposed COD is 2028-08-04.
- Queue ID
- MISO-E0014
- Location
- Richland Parish, Louisiana
- Technology
- Gas
- Developer
- Entergy Louisiana, LLC
- Market / region
- MISO
- Point of interconnection
- Smalling 230kV Substation (new)
What stands out
Franklin Farms is a 1.6 GW Gas project in Louisiana with status active.
Entergy Louisiana, LLC is the reported developer.
The reported queue phase is ERAS Study Cycle 1; proposed COD is 2028-08-04.
Latest linked story: “ETC Tiger Pipeline, LLC; Notice of Application and Establishing Intervention Deadline” (Federal Register (FERC), 2026-07-21).
Market and operating context
- Queue date
- 2025-08-06
- Proposed COD
- 2028-08-04
- IA status
- In Progress (unknown study)
- Study phase
- ERAS Study Cycle 1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.