Franklin Farms (MISO-E0014) — Project Summary

Queue ID
MISO-E0014
Capacity
1640 MW
Technology
Gas
Status
active
Location
Richland Parish, LA
Region
MISO
Developer
Entergy Louisiana, LLC
IA Status
In Progress (unknown study)

Franklin Farms

MISO-E0014BetaActiveGasMISOLBNL

1,640 MW generation in Richland Parish, LA · In queue since August 2025 · Proposed COD August 2028

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

1,640 MW

Capacity

1

Components

Gas

1y 3m

In Queue

In Progress (unknown study)

IA Phase

Signed Nov 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3 months

IA → COD

2y 9m

Total Duration

3 months

Study Phase

ERAS Study Cycle 1

Construction38%
Queue EntryAug 6, 2025

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementNov 19, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2028-08-04

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 4, 2028
From queue filing
Developer in saved assessment
Entergy Louisiana, LLC
Sources agreed at research time
Status at research time
Construction
LBNL shows Active with the IA in progress, but Entergy Louisiana broke ground in Dec 2025 and is procuring equipment (IMI valve contract); the gas supply pipeline is under FERC environmental review.
Financing
Not recorded

Milestones in this assessment

GroundbreakingDec 1, 2025

Entergy Louisiana began construction on a pair of gas plants to supply Meta's Richland Parish data center.

lailluminator.com
COD target2028Latest in this assessment

Cleanview lists Franklin Farms as expected online in 2028.

cleanview.co
Research sources and reasoning (6 recorded sources)

high confidence at research time

  1. lailluminator.com/2025/12/01/entergy-builds-power-plant-for-data-center/
  2. entergy.com/news/entergy-louisiana-breaks-ground-on-new-state-of-the-art-generation-facilities-to-power-reliability-growth-and-innovation
  3. pgjonline.com/news/2026/september/imi-to-supply-valves-for-15-gw-louisiana-gas-power-plant
  4. knoe.com/2026/08/31/federal-energy-regulatory-commission-asks-comments-franklin-farms-project/
  5. cleanview.co/power-projects/planned/natural-gas-power-plants/louisiana/68214_1A/franklin-farms-12
  6. federalregister.gov/documents/2026/07/21/2026-14686/etc-tiger-pipeline-llc-notice-of-application-and-establishing-intervention-deadline

Commercial operation date: LBNL's proposed COD of 2028-08-04 is consistent with Cleanview's 'Expected online 2028'. The snippets I had contained no newer, conflicting COD, and construction began Dec 2025, which fits a 2028 in-service date.

Developer: Entergy's press release and trade coverage confirm Entergy Louisiana is building the Franklin Farms plants for Meta's data center, matching the LBNL filing entity. The 'ETC Tiger Pipeline, LLC' developer value in the news extraction is the FERC applicant for the gas supply pipeline, not the power plant developer.

Status: Entergy's press release and Louisiana Illuminator report that construction began Dec 1, 2025 in Richland Parish. A later IMI valve supply contract and the FERC pipeline comment process indicate ongoing build-out.

Project lifecycle
as of 2026-07-21
OperationalNoFederal Register (FERC) · 2026-07-21
TechnologygasFederal Register (FERC) · 2026-07-21
DeveloperETC Tiger Pipeline, LLCFederal Register (FERC) · 2026-07-21
PPA offtakerEntergy Louisiana, LLCFederal Register (FERC) · 2026-07-21
Permit decisionpendingFederal Register (FERC) · 2026-07-21

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Franklin Farms (queue ID MISO-E0014) is a proposed 1,640 MW natural gas-fired generation project located in Richland Parish, Louisiana. The development project is being advanced by Entergy Louisiana, LLC, which is also listed as the interconnecting utility. The project would connect to the grid at the Smalling 230kV Substation, a new facility, and has requested Network Resource Interconnection Service (NRIS).

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO) with active status. It entered the queue on August 6, 2025, and is being evaluated as part of MISO's Expedited Resource Addition Study (ERAS) Study Cycle 1. Its interconnection agreement status is listed as in progress, with an associated date of November 19, 2025. The proposed commercial operation date is August 4, 2028. Franklin Farms has appeared in recent news coverage, with one article focused on regulatory matters.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Richland Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Entergy Louisiana, LLC

Utility

Entergy Louisiana, LLC

Entity

MISO

Service Type

NRIS

Point of Interconnection

Smalling 230kV Substation (new)

Data Source

LBNL

ApplicantETC Tiger Pipeline, LLCFederal Register (FERC) · 2026-07-21
AgencyFERCFederal Register (FERC) · 2026-07-21
RulingNoticeFederal Register (FERC) · 2026-07-21
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
POI Substation
Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-07-21

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.