Caldwell County Energy Center is a 1.5 GW Gas project in Texas, currently active.
Caldwell County Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-04-30.
- Queue ID
- ERCOT-30INR0031
- Location
- Caldwell, Texas
- Technology
- Gas
- Developer
- Caldwell County Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- #7051 Misty Substation 345kV
What stands out
Caldwell County Energy Center is a 1.5 GW Gas project in Texas with status active.
Caldwell County Energy Center, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-04-30.
Latest linked story: “Entergy Arkansas begins operating 100-MW solar facility near Brinkley” (Talk Business & Politics, 2024-09-19).
Market and operating context
- Queue date
- 2025-02-03
- Proposed COD
- 2030-04-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.