Query
FPL Energy Burleigh County Wind
Type
Entity Briefing
Entity
Caldwell County Energy Center
Technology
wind
Generated
2026-10-08T23:51:28.245Z

Briefing on Caldwell County Energy Center

Entity Briefing
Generated Oct 8, 2026·Dataset freshness not reported
1.5 GW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2030-04-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Caldwell County Energy Center is a 1.5 GW Gas project in Texas, currently active.

Caldwell County Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-04-30.

Queue ID
ERCOT-30INR0031
Location
Caldwell, Texas
Technology
Gas
Developer
Caldwell County Energy Center, LLC
Market / region
ERCOT
Point of interconnection
#7051 Misty Substation 345kV

What stands out

1

Caldwell County Energy Center is a 1.5 GW Gas project in Texas with status active.

2

Caldwell County Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-04-30.

4

Latest linked story: “Entergy Arkansas begins operating 100-MW solar facility near Brinkley” (Talk Business & Politics, 2024-09-19).

Market and operating context

Queue date
2025-02-03
Proposed COD
2030-04-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Caldwell County Energy Center — verified asset snapshot

FieldValue
Queue IDERCOT-30INR0031
LocationCaldwell, Texas
TechnologyGas
DeveloperCaldwell County Energy Center, LLC
Market / regionERCOT
Point of interconnection#7051 Misty Substation 345kV
Queue date2025-02-03
Proposed COD2030-04-30