Briefing/projectactive
Forts Trail BESS is a 209 MW Solar+Battery project in Texas, currently active.
JC Central Bluff, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-25.
- Queue ID
- ERCOT-24INR0341
- Location
- Taylor, Texas
- Technology
- Solar+Battery
- Developer
- JC Central Bluff, LLC
- Market / region
- ERCOT
- Point of interconnection
- 11406 Central Bluff Switch 345kV
What stands out
1
Forts Trail BESS is a 209 MW Solar+Battery project in Texas with status active.
2
JC Central Bluff, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-07-25.
Market and operating context
- Queue date
- 2022-06-02
- Proposed COD
- 2028-07-25
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.