Briefing on Fort Concho Energy storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
251 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Fort Concho Energy storage is a 251 MW Battery project in Texas, currently active.

Rocky Mountain Energy Development, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-25INR0339
Location
Tom Green, Texas
Technology
Battery
Developer
Rocky Mountain Energy Development, LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV #76320 Schkade - #76011 Twin Buttes Line; LCRA

What stands out

1

Fort Concho Energy storage is a 251 MW Battery project in Texas with status active.

2

Rocky Mountain Energy Development, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

Market and operating context

Queue date
2023-01-30
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Fort Concho Energy storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0339
LocationTom Green, Texas
TechnologyBattery
DeveloperRocky Mountain Energy Development, LLC
Market / regionERCOT
Point of interconnectionTap 138 kV #76320 Schkade - #76011 Twin Buttes Line; LCRA
Queue date2023-01-30
Proposed COD2028-12-31