Briefing/projectactive
Flint River 780 MW Unit is a 780 MW Gas project in Georgia, currently active.
The reported queue phase is System Impact Study. Proposed COD is 2029-08-01.
- Queue ID
- GTC-GI-198
- Location
- Mitchell, Georgia
- Technology
- Gas
- Market / region
- Southeast
- Point of interconnection
- Raccoon Creek Substation
What stands out
1
Flint River 780 MW Unit is a 780 MW Gas project in Georgia with status active.
2
The reported queue phase is System Impact Study; proposed COD is 2029-08-01.
Market and operating context
- Queue date
- 2024-10-09
- Proposed COD
- 2029-08-01
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.