Felix North Solar is a 201 MW Solar+Battery project in Texas, currently active.
Crescent Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-31.
- Queue ID
- ERCOT-22INR0209
- Location
- Wilbarger, Texas
- Technology
- Solar+Battery
- Developer
- Crescent Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- 6101 Riley 345kV
What stands out
Felix North Solar is a 201 MW Solar+Battery project in Texas with status active.
Crescent Solar, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2028-12-31.
Latest linked story: “AES (NYSE: AES) pushes renewables backlog and U.S. utility rate base growth” (Stock Titan, 2026-03-09).
Market and operating context
- Queue date
- 2019-01-17
- Proposed COD
- 2028-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.