Query
Estrella Dorada Wind
Type
Entity Briefing
Entity
Estrella Dorada Wind
Generated
2026-10-20T01:10:02.908Z

Briefing on Estrella Dorada Wind

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
306 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2029-07-13
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Estrella Dorada Wind is a 306 MW Wind project in Texas, currently active.

Estrella Dorada Wind Farm, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-13.

Queue ID
ERCOT-29INR0146
Location
Duval, Texas
Technology
Wind
Developer
Estrella Dorada Wind Farm, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2

What stands out

1

Estrella Dorada Wind is a 306 MW Wind project in Texas with status active.

2

Estrella Dorada Wind Farm, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-13.

Market and operating context

Queue date
2025-07-21
Proposed COD
2029-07-13
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Estrella Dorada Wind — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0146
LocationDuval, Texas
TechnologyWind
DeveloperEstrella Dorada Wind Farm, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2
Queue date2025-07-21
Proposed COD2029-07-13