Briefing on Enfinity Post Oak Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
500 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-12-18
Proposed COD
Briefing/projectactive

Enfinity Post Oak Solar SLF is a 500 MW Solar project in Texas, currently active.

EG White Oak LLC is the reported developer. Proposed COD is 2029-12-18.

Queue ID
ERCOT-29INR0291
Location
Howard, Texas
Technology
Solar
Developer
EG White Oak LLC
Market / region
ERCOT
Point of interconnection
345kV Long draw (59900) to Sand Bluff (59902)

What stands out

1

Enfinity Post Oak Solar SLF is a 500 MW Solar project in Texas with status active.

2

EG White Oak LLC is the reported developer.

3

proposed COD is 2029-12-18.

Market and operating context

Queue date
2026-03-30
Proposed COD
2029-12-18

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Enfinity Post Oak Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0291
LocationHoward, Texas
TechnologySolar
DeveloperEG White Oak LLC
Market / regionERCOT
Point of interconnection345kV Long draw (59900) to Sand Bluff (59902)
Queue date2026-03-30
Proposed COD2029-12-18