Enfinity Post Oak Solar SLF (ERCOT-29INR0291) — Project Summary

Queue ID
ERCOT-29INR0291
Capacity
500 MW
Technology
Solar
Status
active
Location
Borden, TX
Region
ERCOT
Developer
EG White Oak LLC
IA Status
—

Enfinity Post Oak Solar SLF

ERCOT-29INR0291BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

500 MW generation in Borden, TX · In queue since March 2026 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

500 MW

Capacity

0

Components

8 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryMar 30, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-18

Queue history
29INR0291 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

0 times

Dec 2029 → Dec 2029

Net change

0 months

first report to latest

Capacity

500 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 30, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 18, 2029
From queue filing
Developer in saved assessment
Enfinity Global
Filed as EG White Oak LLC
Status at research time
Active
Active in the ERCOT queue with no interconnection agreement (IA) yet; ercotqueue.com shows 'No IA' and a 4% build-chance estimate. No construction or financing news found.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-29inr0291
  2. ercotqueue.com/project/29INR0291
  3. cleanview.co/power-projects/planned/solar-farms/texas/29INR0291/-enfinity-post-oak-solar-slf

Commercial operation date: Only the LBNL/ERCOT queue date (2029-12-18) exists. Aggregators such as interconnection.fyi and cleanview repeat it ('Expected online 2029'), but they are derived from the same queue data and are not independent confirmation. No developer press release or news item gives a different target.

Developer: The project name carries the 'Enfinity' brand, and 'EG' in 'EG White Oak LLC' most likely stands for Enfinity Global, so the LLC looks like a project shell. No search result explicitly confirms the parent relationship, so this is inferred from naming.

Status: The LBNL status is active, and the aggregator listings (ercotqueue.com, interconnection.fyi) agree. Nothing suggests withdrawal or construction. The queue date of 2026-03-30 is recent, so the project is at an early stage.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Enfinity Post Oak Solar SLF is a proposed 500 MW photovoltaic solar generation project located in Borden County, Texas. The development project is being advanced by EG White Oak LLC and is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-29INR0291. As a standalone generation project, it consists solely of photovoltaic solar capacity and does not include a battery storage component in the queue data.

The project entered the ERCOT interconnection queue on March 30, 2026, and its queue status is currently active. It proposes to interconnect at the 345 kV Muleshoe substation (bus 59922), with a proposed commercial operation date of December 18, 2029. The available data does not indicate the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Borden

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

EG White Oak LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345kV Muleshoe (59922)

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.