Briefing/projectactive
Elmax Power Station is a 519 MW Gas project in Texas, currently active.
Elmax Generating, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-07-05.
- Queue ID
- ERCOT-23INR0345
- Location
- Harris, Texas
- Technology
- Gas
- Developer
- Elmax Generating, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV Lake Houston (#40820) - Atascocita (#40130) ckt 66
What stands out
1
Elmax Power Station is a 519 MW Gas project in Texas with status active.
2
Elmax Generating, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-07-05.
Market and operating context
- Queue date
- 2021-09-14
- Proposed COD
- 2028-07-05
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.