Briefing on Elk Unit 4

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
210 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2027-02-28
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Elk Unit 4 is a 210 MW Gas project in Texas, currently active.

Golden Spread Electric Cooperative, Inc. is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-02-28.

Queue ID
ERCOT-27INR0181
Location
Hale, Texas
Technology
Gas
Developer
Golden Spread Electric Cooperative, Inc.
Market / region
ERCOT
Point of interconnection
141607 AEEC_5

What stands out

1

Elk Unit 4 is a 210 MW Gas project in Texas with status active.

2

Golden Spread Electric Cooperative, Inc. is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-02-28.

4

Latest linked story: “U.S. Data Center Power Consumption Map by State (2026)” (ElectricChoice.com, 2026-07-04).

Market and operating context

Queue date
2024-04-09
Proposed COD
2027-02-28
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Elk Unit 4 — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0181
LocationHale, Texas
TechnologyGas
DeveloperGolden Spread Electric Cooperative, Inc.
Market / regionERCOT
Point of interconnection141607 AEEC_5
Queue date2024-04-09
Proposed COD2027-02-28