Briefing on ELECTRODE BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

ELECTRODE BESS is a 150 MW Battery project in Texas, currently active.

CED Development Inc. is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.

Queue ID
ERCOT-24INR0393
Location
Upton, Texas
Technology
Battery
Developer
CED Development Inc.
Market / region
ERCOT
Point of interconnection
76040 Castillo 138kV

What stands out

1

ELECTRODE BESS is a 150 MW Battery project in Texas with status active.

2

CED Development Inc. is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-31.

Market and operating context

Queue date
2022-07-25
Proposed COD
2027-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ELECTRODE BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0393
LocationUpton, Texas
TechnologyBattery
DeveloperCED Development Inc.
Market / regionERCOT
Point of interconnection76040 Castillo 138kV
Queue date2022-07-25
Proposed COD2027-12-31