Briefing on Elbus BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Elbus BESS is a 201 MW Battery project in Texas, currently active.

BRP Elbus BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-01.

Queue ID
ERCOT-23INR0135
Location
Caldwell, Texas
Technology
Battery
Developer
BRP Elbus BESS LLC
Market / region
ERCOT
Point of interconnection
9075 Lytton 138kV

What stands out

1

Elbus BESS is a 201 MW Battery project in Texas with status active.

2

BRP Elbus BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-01.

Market and operating context

Queue date
2020-12-03
Proposed COD
2028-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Elbus BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0135
LocationCaldwell, Texas
TechnologyBattery
DeveloperBRP Elbus BESS LLC
Market / regionERCOT
Point of interconnection9075 Lytton 138kV
Queue date2020-12-03
Proposed COD2028-06-01