Query
El Sauz Ranch
Type
Entity Briefing
Entity
El Sauz Ranch
Generated
2026-10-10T18:00:54.682Z

Briefing on El Sauz Ranch

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
302 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2026-06-02
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

El Sauz Ranch is a 302 MW Wind project in Texas, currently active.

Chubu Electric Power is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-06-02.

Queue ID
ERCOT-20INR0097
Location
Willacy, Texas
Technology
Wind
Developer
Chubu Electric Power
Market / region
ERCOT
Point of interconnection
8663 EL SAUZ POI 345kV

What stands out

1

El Sauz Ranch is a 302 MW Wind project in Texas with status active.

2

Chubu Electric Power is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-06-02.

4

Latest linked story: “El Sauz Onshore Wind Power Project, Texas, US” (NS Energy, 2022-06-03).

Market and operating context

Queue date
2018-06-19
Proposed COD
2026-06-02
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

El Sauz Ranch — verified asset snapshot

FieldValue
Queue IDERCOT-20INR0097
LocationWillacy, Texas
TechnologyWind
DeveloperChubu Electric Power
Market / regionERCOT
Point of interconnection8663 EL SAUZ POI 345kV
Queue date2018-06-19
Proposed COD2026-06-02