El Sauz Ranch (ERCOT-20INR0097) — Project Summary

Queue ID
ERCOT-20INR0097
Capacity
301.5 MW
Technology
Wind
Status
active
Location
Willacy, TX
Region
ERCOT
Developer
El Sauz Ranch Wind, LLC
IA Status
IA Executed

El Sauz Ranch

ERCOT-20INR0097BetaActiveWindERCOTLBNL + Live

301.5 MW generation in Willacy, TX · In queue since June 2018 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.5 MW

Capacity

1

Components

Wind

8y 5m

In Queue

IA Executed

IA Phase

Signed Jan 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 7m

IA → COD

5y 11m

Total Duration

2y 7m

Construction75%
Queue EntryJun 19, 2018

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 27, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2026-12-01

Queue history
20INR0097 · 91 monthly ERCOT reports, Mar 2019 – Sep 2026

Projected COD moved

34 times

Sep 2021 → Dec 2026

Net change

+63 months

first report to latest

Capacity

302 → 302 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 19, 2018
Facilities study approvedOct 29, 2021
Interconnection agreement signedJan 27, 2021
Approved for energizationSep 28, 2022
Approved for synchronizationFeb 28, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 4y 5m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneconstruction commenced · 2022-01NS Energy · 2022-06-03
Expected CODQ4 2022NS Energy · 2022-06-03

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2025
Differs from queue: Dec 1, 2026
Developer in saved assessment
JERA Americas (JERA Co.)
Ownership change in saved research
Status at research time
Online
LBNL shows Active with IA Executed, but the 301 MW plant has been operating since about January 2025 per EIA data.
Financing
Not recorded
Ownership history
  1. 2021-12·Apex Clean Energy→JERA Americas (JERA Co.)businesswire.com

Milestones in this assessment

Ownership changeDec 2021

JERA Americas acquired 100% of the El Sauz wind project from Apex Clean Energy.

businesswire.com
GroundbreakingJan 2022Latest in this assessment

Construction commenced on the roughly 300 MW El Sauz onshore wind project.

nsenergybusiness.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. businesswire.com/news/home/20211201006236/en/JERA-Americas-Acquires-El-Sauz-Wind-Project-in-Texas-from-Apex-Clean-Energy
  2. nsenergybusiness.com/projects/el-sauz-onshore-wind-power-project/
  3. askthegrid.com/assets/facilities/el-sauz-ranch-wind-llc
  4. infrasure.ai/plant/65760-el-sauz-ranch-wind-llc
  5. cleanview.co/power-projects/operating/wind-farms/texas/65760/el-sauz-ranch-wind-llc

Commercial operation date: askthegrid reports that EIA's May 2026 inventory lists one operating generator dated January 2025, and infrasure.ai says the facility 'began operating in 2025'. Cleanview also lists it as operating. LBNL's proposed COD of 2026-12-01 is about 1.9 years later than this. The 2022 news target of Q4 2022 was never met.

Developer: Business Wire (Dec 2021) says JERA Americas acquired a 100% interest in the project from Apex Clean Energy. NS Energy also names JERA Renewables as developer. The LBNL entity is the project shell LLC. A 2019 MyRGV article credited E.ON with announcing the project, but no source documents an E.ON ownership transfer, so it is not included in the history.

Status: Construction began in January 2022 (NS Energy). Cleanview, infrasure.ai and askthegrid (citing EIA) all list the plant as operating, so the LBNL 'active' status is stale.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The El Sauz Ranch project is a proposed 301.5 MW wind generation project located in Willacy County, Texas. Developed by El Sauz Ranch Wind, LLC, the project consists entirely of wind generation. It is interconnected within the ERCOT queue as entry ERCOT-20INR0097, with a queue entry date of June 19, 2018, and a proposed commercial operation date of March 16, 2026. The project's Interconnection Agreement (IA) was executed on January 27, 2021.

The proposed project is linked to the existing El Sauz Ranch Wind, LLC operating plant (EIA ID 65760). Recent news coverage has discussed the project in the context of industry developments.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Willacy

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

El Sauz Ranch Wind, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8663 EL SAUZ POI 345kV

Data Source

LBNL + Live

DeveloperJERA RenewablesNS Energy · 2022-06-03
CompanyE.on Climate and Renewables North AmericaMyRGV.com · 2019-08-20
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
ELSAUZ_ALL

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.