Briefing/projectactive
EL REY POWER BANK is a 124 MW Battery project in California, currently active.
The reported queue phase is C14. Proposed COD is 2029-01-02.
- Queue ID
- CAISO-1928
- Location
- Monterey, California
- Technology
- Battery
- Market / region
- CAISO
- Point of interconnection
- Coburn-Basic Energy 60 kV Line
What stands out
1
EL REY POWER BANK is a 124 MW Battery project in California with status active.
2
The reported queue phase is C14; proposed COD is 2029-01-02.
3
Latest linked story: “How giant ‘water batteries’ could make green power reliable” (Science | AAAS, 2024-01-25).
Market and operating context
- Queue date
- 2021-04-15
- Proposed COD
- 2029-01-02
- IA status
- System Impact Study
- Study phase
- C14
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.