Briefing on EL REY POWER BANK

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
124 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2029-01-02
Proposed COD
C14
Queue phase
Briefing/projectactive

EL REY POWER BANK is a 124 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2029-01-02.

Queue ID
CAISO-1928
Location
Monterey, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Coburn-Basic Energy 60 kV Line

What stands out

1

EL REY POWER BANK is a 124 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2029-01-02.

3

Latest linked story: “How giant ‘water batteries’ could make green power reliable” (Science | AAAS, 2024-01-25).

Market and operating context

Queue date
2021-04-15
Proposed COD
2029-01-02
IA status
System Impact Study
Study phase
C14
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

EL REY POWER BANK — verified asset snapshot

FieldValue
Queue IDCAISO-1928
LocationMonterey, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionCoburn-Basic Energy 60 kV Line
Queue date2021-04-15
Proposed COD2029-01-02
IA statusSystem Impact Study