El Patrimonio Solar is a 152 MW Solar project in Texas, currently active.
Heritage Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-04-29.
- Queue ID
- ERCOT-23INR0207
- Location
- Bexar, Texas
- Technology
- Solar
- Developer
- Heritage Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 138kV 5429 Trumbo - 5260 Leon Creek
What stands out
El Patrimonio Solar is a 152 MW Solar project in Texas with status active.
Heritage Solar, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2027-04-29.
Latest linked story: “Solar farm planned on over 800 acres in South Side opportunity zone” (San Antonio Express-News, 2023-03-29).
Market and operating context
- Queue date
- 2021-03-16
- Proposed COD
- 2027-04-29
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.