Query
El Dorado Refinery
Type
Entity Briefing
Entity
Dorado Solar
State
CO
Generated
2026-10-10T13:49:18.483Z

Briefing on Dorado Solar

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
401 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-02-16
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Dorado Solar is a 401 MW Solar project in Texas, currently active.

Enbridge Solar (Sequoia I), LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-02-16.

Queue ID
ERCOT-22INR0261
Location
Callahan, Texas
Technology
Solar
Developer
Enbridge Solar (Sequoia I), LLC
Market / region
ERCOT
Point of interconnection
68051 Reata 345kV

What stands out

1

Dorado Solar is a 401 MW Solar project in Texas with status active.

2

Enbridge Solar (Sequoia I), LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-02-16.

Market and operating context

Queue date
2020-01-09
Proposed COD
2026-02-16
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Dorado Solar — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0261
LocationCallahan, Texas
TechnologySolar
DeveloperEnbridge Solar (Sequoia I), LLC
Market / regionERCOT
Point of interconnection68051 Reata 345kV
Queue date2020-01-09
Proposed COD2026-02-16