Easy Wind Energy Center is a 241 MW Wind+Battery project in Texas, currently active.
Easy Wind Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-27INR0246
- Location
- Schleicher, Texas
- Technology
- Wind+Battery
- Developer
- Easy Wind Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV #76003 Big Hill - #76005 Schneeman Draw circuit #1
What stands out
Easy Wind Energy Center is a 241 MW Wind+Battery project in Texas with status active.
Easy Wind Energy Center, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
Latest linked story: “Harnessing New Mexico Wind: One State’s Fight to Win Hearts and Minds for Clean Energy” (Third Way, 2025-10-22).
Market and operating context
- Queue date
- 2024-05-20
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.