Dragan Storage is a 408 MW Solar+Battery project in Texas, currently active.
Hecate Grid Dragan Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-03-31.
- Queue ID
- ERCOT-22INR0400
- Location
- Comanche, Texas
- Technology
- Solar+Battery
- Developer
- Hecate Grid Dragan Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- 1440 Comanche 345kV
What stands out
Dragan Storage is a 408 MW Solar+Battery project in Texas with status active.
Hecate Grid Dragan Storage LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-03-31.
Latest linked story: “Enchanted Rock keeps the power on for businesses, critical infrastructure, and communities” (Energy, Oil & Gas magazine, 2025-12-02).
Market and operating context
- Queue date
- 2020-08-21
- Proposed COD
- 2030-03-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.