Tres Rios Ranch Solar is a 508 MW Solar+Battery project in Texas, currently active.
LectricWind LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-24INR0404
- Location
- Upton, Texas
- Technology
- Solar+Battery
- Developer
- LectricWind LLC
- Market / region
- ERCOT
- Point of interconnection
- 76008 Twelvemile 345kV
What stands out
1
Tres Rios Ranch Solar is a 508 MW Solar+Battery project in Texas with status active.
2
LectricWind LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-31.
Market and operating context
- Queue date
- 2022-08-05
- Proposed COD
- 2027-12-31
- IA status
- Facility Study
- Study phase
- Facility Study