Tres Rios Ranch Solar
ISO/RTO
isone
Technology
battery
Generated
2026-10-11T08:41:47.160Z

Briefing on Tres Rios Ranch Solar

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
508 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Tres Rios Ranch Solar is a 508 MW Solar+Battery project in Texas, currently active.

LectricWind LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.

Queue ID
ERCOT-24INR0404
Location
Upton, Texas
Technology
Solar+Battery
Developer
LectricWind LLC
Market / region
ERCOT
Point of interconnection
76008 Twelvemile 345kV

What stands out

1

Tres Rios Ranch Solar is a 508 MW Solar+Battery project in Texas with status active.

2

LectricWind LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-31.

Market and operating context

Queue date
2022-08-05
Proposed COD
2027-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Tres Rios Ranch Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0404
LocationUpton, Texas
TechnologySolar+Battery
DeveloperLectricWind LLC
Market / regionERCOT
Point of interconnection76008 Twelvemile 345kV
Queue date2022-08-05
Proposed COD2027-12-31