Query
DOS RIOS ENERGY STORAGE SLF
Type
Entity Briefing
Entity
DOS RIOS ENERGY STORAGE SLF
Technology
battery
Generated
2026-10-05T07:17:09.760Z

Briefing on DOS RIOS ENERGY STORAGE SLF

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
165 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-03-15
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

DOS RIOS ENERGY STORAGE SLF is a 165 MW Battery project in Texas, currently active.

DOS RIOS SOLAR, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-03-15.

Queue ID
ERCOT-24INR0476
Location
Milam, Texas
Technology
Battery
Developer
DOS RIOS SOLAR, LLC
Market / region
ERCOT
Point of interconnection
TAP 69 KV 61 BRANCHVILLE -- 65 SILVER CITY

What stands out

1

DOS RIOS ENERGY STORAGE SLF is a 165 MW Battery project in Texas with status active.

2

DOS RIOS SOLAR, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-03-15.

Market and operating context

Queue date
2022-11-15
Proposed COD
2027-03-15
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

DOS RIOS ENERGY STORAGE SLF — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0476
LocationMilam, Texas
TechnologyBattery
DeveloperDOS RIOS SOLAR, LLC
Market / regionERCOT
Point of interconnectionTAP 69 KV 61 BRANCHVILLE -- 65 SILVER CITY
Queue date2022-11-15
Proposed COD2027-03-15