Briefing/projectactive
DOS RIOS ENERGY STORAGE SLF is a 165 MW Battery project in Texas, currently active.
DOS RIOS SOLAR, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-03-15.
- Queue ID
- ERCOT-24INR0476
- Location
- Milam, Texas
- Technology
- Battery
- Developer
- DOS RIOS SOLAR, LLC
- Market / region
- ERCOT
- Point of interconnection
- TAP 69 KV 61 BRANCHVILLE -- 65 SILVER CITY
What stands out
1
DOS RIOS ENERGY STORAGE SLF is a 165 MW Battery project in Texas with status active.
2
DOS RIOS SOLAR, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-03-15.
Market and operating context
- Queue date
- 2022-11-15
- Proposed COD
- 2027-03-15
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.