Dodd Solar I is a 202 MW Solar project in Texas, currently active.
Forest Grove Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-06-05.
- Queue ID
- ERCOT-23INR0261
- Location
- Henderson, Texas
- Technology
- Solar
- Developer
- Forest Grove Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 6951 Eustace Southeast Switch – 3131 Forest Grove Switch
What stands out
1
Dodd Solar I is a 202 MW Solar project in Texas with status active.
2
Forest Grove Solar LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-06-05.
4
Latest linked story: “Texas residents push back against solar plant construction” (KLTV.com, 2022-01-27).
Market and operating context
- Queue date
- 2021-06-24
- Proposed COD
- 2028-06-05
- IA status
- IA Executed
- Study phase
- IA Executed