Briefing on Dodd Solar I

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
202 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-06-05
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Dodd Solar I is a 202 MW Solar project in Texas, currently active.

Forest Grove Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-06-05.

Queue ID
ERCOT-23INR0261
Location
Henderson, Texas
Technology
Solar
Developer
Forest Grove Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 6951 Eustace Southeast Switch – 3131 Forest Grove Switch

What stands out

1

Dodd Solar I is a 202 MW Solar project in Texas with status active.

2

Forest Grove Solar LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-06-05.

4

Latest linked story: “Texas residents push back against solar plant construction” (KLTV.com, 2022-01-27).

Market and operating context

Queue date
2021-06-24
Proposed COD
2028-06-05
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Dodd Solar I — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0261
LocationHenderson, Texas
TechnologySolar
DeveloperForest Grove Solar LLC
Market / regionERCOT
Point of interconnectionTap 138kV 6951 Eustace Southeast Switch – 3131 Forest Grove Switch
Queue date2021-06-24