Diver Solar is a 226 MW Solar project in Texas, currently active.
Diver Solar is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-16.
- Queue ID
- ERCOT-25INR0105
- Location
- Limestone, Texas
- Technology
- Solar
- Developer
- Diver Solar
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 3384 St Johns - 3390 Jewett
What stands out
1
Diver Solar is a 226 MW Solar project in Texas with status active.
2
Diver Solar is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-01-16.
4
Latest linked story: “$500M Kelso Solar Project breaks ground in Missouri” (Construction Dive, 2025-05-13).
Market and operating context
- Queue date
- 2022-09-02
- Proposed COD
- 2026-01-16
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.