Briefing/projectactive
Dellwood Solar is a 150 MW Solar+Battery project in Georgia, currently active.
The reported queue phase is Facility Study. Proposed COD is 2024-02-28.
- Queue ID
- GTC-GI-149
- Location
- Emanuel, Georgia
- Technology
- Solar+Battery
- Market / region
- Southeast
- Point of interconnection
- Vidalia-Wadley Primary (white) 230 kV line
What stands out
1
Dellwood Solar is a 150 MW Solar+Battery project in Georgia with status active.
2
The reported queue phase is Facility Study; proposed COD is 2024-02-28.
Market and operating context
- Queue date
- 2021-05-04
- Proposed COD
- 2024-02-28
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.